Flat Preloader Icon

201-608-0682

SPRINGHILL SUITE WOODBRIDGE

Work on the completed project:

▪ Demolition of the existing building with partial building walls to be utilized

▪ Backfilling and building pad improvement by installing GEO piers and structural fill for hotel buildings.

▪ Site Grading

▪ Site utility work

▪ Building construction includes footing foundation, structural steel, metal and wood framing, energy-saving systems, fire suppression systems, Audio video, security systems, networking, fireproofing, elevators, concrete floors and stairs, interior and exterior finishes, MEP, Doors, and windows,

FF&E

Skills

Posted on

July 8, 2024